<img alt="" src="https://secure.redd7liod.com/155840.png" style="display:none;">

Pure Power Engineering will guide your solar + storage project through the development process and secure approval for your interconnection application with the utility on the initial submission. Our interconnection documents (stamped single/three line diagrams), site plans, and construction documents are well known in the industry for being easy to understand for our non-engineer clients and installers. This brings the following benefits:

  • Procurement – Avoid mistakes when ordering materials.
  • Permits – Faster approval by the AHJ.
  • Installers - Avoid errors or bad practices during installation
Our code compliant, value engineered and risk mitigating construction drawings will save your business significant capital & operating expenses while maximizing the performance and profitability of your solar + storage systems.

DSC07386

Featured Articles

blog

NEC 2026 - The Code Changes That Matter Most for Solar Developers and EPCs

The 2026 edition of the National Electrical Code (NEC) introduces a wide range of updates that affect how solar PV ...

Read More
blog

6 Practical Insights for Standalone Battery Energy Storage System (BESS) Design

Driven by grid stability & reliability needs and by the integration of renewables, Standalone BESS (battery energy ...

Read More
blog

The Power of Interconnection Planning - Why Solar Developers Need PSCAD, PSS®E, and ASPEN Expertise

Interconnection queues are more congested than ever, and the path to approval is increasingly opaque. Developers are ...

Read More

Nationwide Footprint

We are a single firm that can meet your needs everywhere you are developing or installing. 

130+

In-House Engineers

3,400+

Solar & BESS Designs 100KW+

17,000+

Project Touchpoints

58+

PMs and Professional Engineers

image 9

Related Videos

The Benefits of Drone Surveys for Solar + BESS Design

Site Survey Benefits | Engineer of Record Services

Value Engineering Tips See More

The 2026 edition of the National Electrical Code (NEC) introduces a wide range of updates that affect how solar PV systems are designed, installed, and inspected. While many revisions are editorial or structural, several changes have real..

Driven by grid stability & reliability needs and by the integration of renewables, Standalone BESS (battery energy storage systems) are moving from pilot to mainstream. But anyone who has tried to develop or engineer one, especially in dense, highly..

Interconnection queues are more congested than ever, and the path to approval is increasingly opaque. Developers are spending serious money on land control, studies, and legal work, only to hit delays when grid studies surface surprises late in the..

In the public eye, there is hardly a conversation about utility-scale solar without addressing the fear of losing valuable farmland. Debates with community involvement tend to be polarized. Developers see open fields as ideal for solar, while..