Solar + Energy Storage Site Survey | Engineer Of Record
Site surveys allow Pure Power to get a complete understanding of the site conditions so that we can provide accurate drawings based on existing electrical equipment. PPE will assess the whole site - roof, electrical room, and exterior area. This helps adjust our drawings for optimal constructability. In addition, physical presence on-site allows Pure Power engineers to capture dimensions, obstructions, and working space requirements that photos could miss.
Pure Power Engineering will guide your solar + storage project through the development process and secure approval for your interconnection application with the utility on the initial submission. Our interconnection documents (stamped single/three line diagrams), site plans, and construction documents are well known in the industry for being easy to understand for our non-engineer clients and installers. This brings the following benefits:
- Procurement – Avoid mistakes when ordering materials.
- Permits – Faster approval by the AHJ.
- Installers - Avoid errors or bad practices during installation

Featured Articles
NEC 2026 - The Code Changes That Matter Most for Solar Developers and EPCs
The 2026 edition of the National Electrical Code (NEC) introduces a wide range of updates that affect how solar PV ...
Read More6 Practical Insights for Standalone Battery Energy Storage System (BESS) Design
Driven by grid stability & reliability needs and by the integration of renewables, Standalone BESS (battery energy ...
Read MoreThe Power of Interconnection Planning - Why Solar Developers Need PSCAD, PSS®E, and ASPEN Expertise
Interconnection queues are more congested than ever, and the path to approval is increasingly opaque. Developers are ...
Read MoreRelated Videos
The Benefits of Drone Surveys for Solar + BESS Design
Site Survey Benefits | Engineer of Record Services
Value Engineering Tips See More
NEC 2026 - The Code Changes That Matter Most for Solar Developers and EPCs
The 2026 edition of the National Electrical Code (NEC) introduces a wide range of updates that affect how solar PV systems are designed, installed, and inspected. While many revisions are editorial or structural, several changes have real..
6 Practical Insights for Standalone Battery Energy Storage System (BESS) Design
Driven by grid stability & reliability needs and by the integration of renewables, Standalone BESS (battery energy storage systems) are moving from pilot to mainstream. But anyone who has tried to develop or engineer one, especially in dense, highly..
The Power of Interconnection Planning - Why Solar Developers Need PSCAD, PSS®E, and ASPEN Expertise
Interconnection queues are more congested than ever, and the path to approval is increasingly opaque. Developers are spending serious money on land control, studies, and legal work, only to hit delays when grid studies surface surprises late in the..
In the public eye, there is hardly a conversation about utility-scale solar without addressing the fear of losing valuable farmland. Debates with community involvement tend to be polarized. Developers see open fields as ideal for solar, while..