480 to 208 Transformers are commonly needed to step down 480V inverters for 208V services. Unfortunately electrical rooms are often crowded with existing equipment. Sometimes there isn’t room for a transformer, so we are often forced to locate the...
Continue ReadingAuthor Archives: Rick Ivins
Latest Discussions
Here is something that’s crazy, and yet we completely understand why they did it. Some evil genius put duct tape around the vents of a NEMA 3R transformer. If this transformer is heavily loaded it runs the risk of overheating, but at least snow cant...
Continue Reading →Everyone knows about the 120% rule, but not everyone understands the situation it is trying to protect against. This article will explain Pure Power’s philosophy on the 120% rule.
Continue Reading →Pure Power engineered a rooftop solar PV system with an innovative new method for mounting string inverters. The inverters are mounted on strut stands directly over cable tray, and the AC and DC wiring is all neatly and compactly run in the cable...
Continue Reading →Im not sure which of these photos is the scariest...
Continue Reading →Thermal (IR) cameras are a great tool for preventative maintenance and inspection of your PV system. With a little thermography “know-how” and some image focusing, problems can be discovered quickly before they create a fault or safety hazard in the...
Continue Reading →On this system, the installer stacked ballast so high that it shades the modules at noon of each day. Why would anyone use a hollow block for ballast?
Continue Reading →This photo is an excellent example of an inverter installation on the roof. Keeping the inverters next to the array allows the unfused string wires to be kept at a minimum length, increasing safety. Notice how the inverters are tilted to the north...
Continue Reading →We were called out to investigate a performance issue at a site, and were shocked to see this wire management. We suspect the AHJ made this contractor install physical protection after the strings were installed, which is why the contractor cut the...
Continue Reading →Just when I thought I have seen it all... Notice the mid-clamp that was never attached because the module was raised off the rail. Scary!
Continue Reading →I appreciate Shoal's new arc fault technology as shown in this advertisement, however I was shocked to see the photo of a man standing on PV modules.
Continue Reading →When you select the wrong transformer enclosure rating, moisture will get into the transformer enclosure and cause faults. NEMA 3R transformers are effective at keeping out rain, but sometimes no snow drifts.
Continue Reading →While conducting O&M on a Satcon 250kW central inverter, we noticed this fan with an object lodged between the blades.
Continue Reading →In a recent project we were able to value engineer a DC combiner feeder by running an overhead line rather than trenching an underground duct bank. The feeder would have been a 175 feet underground duct bank routed across a high traffic driveway...
Continue Reading →In this installation, an AC panel board was located at ground level which combined the AC circuits from string inverters on the roof. We wanted to avoid entering the top of the enclosure with conduits, so a trough was used so that the feeders could...
Continue Reading →During O&M we often find combiner boxes and disconnect switches with water inside them, despite the box being NEMA 4 and fully gasketed, no top or side penetrations, and weather tight connectors properly installed.
Continue Reading →Ground Mounted Solar Projects
Municipal Zoning/Planning Approval (566 Municipalities in NJ) All land development activities in the State of New Jersey require some level of Municipal approval. Typically, solar farms require site plan approval from...
Continue Reading →Here is a video I found on the internet, produced by American Apparel. I figured I would share it as an example how NOT to clean PV panels.
Continue Reading →At this site, the intermodule wiring is zip-tied to the rails but the string homeruns are laying loose on the roof, which is poor workmanship. Over time the rough shingles will wear away on the insulation compromising its integrity and putting the...
Continue Reading →Many roofs are designed to support thousands of pounds of HVAC units and large air handlers, so the additional weight of an inverter is feasible in many cases.
Continue Reading →A roof drain clogged causing the water to rise in the surrounding area. This installation has poor wire management, as shown by a connector sitting loose on a ballast block. Once the water rose and got in the connector, it began to short out (burn...
Continue Reading →Be careful with Aluminum Conductors
The cost savings of Aluminum conductors is too good to ignore. Both the engineer and the electrician must respect the differences between copper and the less forgiving aluminum. However, if designed and installed...
Continue Reading →When deciding what size and quantity of combiner boxes to use, always remember to use the full capacity of what you are buying.
Continue Reading →On our first operation and maintenance trip to this site, we discovered an old broken module stashed under a HVAC unit. This module was not secured, and would surely have become airborne during a hurricane or tropical storm. This module could have...
Continue Reading →Value Engineering Combiner Boxes
You can save up to 25% on combiner boxes and DC disconnects switches if they are properly designed. It is well known that you size equipment for 1.56x of the short circuit current. However, with certain solar...
Continue Reading →Over the years, we have seen just about every combination of equations and numbers used to calculate the NEC required values on a DC disconnect switch. NEC requires these values to be calculated and shown on the DC disconnect switch, but it doesn't...
Continue Reading →Two things went wrong here. First, the vegetation was not maintained, allowing it to grow tall enough to shade the modules and cover the modules in lots of pollen. The second mistake is improper seeding. If the site has proper low-growing ground...
Continue Reading →This installer gets full points for creativity, but fails miserably for inappropriate construction means and methods. These cables are not protected from physical damage, and they are not outdoor rated so the UV rays will deteriorate the cables...
Continue Reading →NEMA 3R and 4 inverters and outdoor cabinets may be rated for outdoor use, but any scratches in the paint will expose the metal to rusting. Once the rust gets a foothold, it will quickly spread. In this case, the corrosion should be sanded, primed,...
Continue Reading →PVC conduits are acceptable when used properly (lots of expansion joints). Metallic conduits (EMC, IMC, RGS) are more expensive, but should be in areas subject to physical contact with other items (such as riser up walls, in electrical rooms, etc)....
Continue Reading →Solar arrays are valuable revenue generating assets that require a certain amount of maintenance. How much exactly depends on what type of installation we are talking about (ground mount vs. roof mount), the size of the installation (obviously...