<img alt="" src="https://secure.redd7liod.com/155840.png" style="display:none;">

10 MW Solar Farm

Pure Power has been awarded the engineering contract for a 10.0 MW-AC / 12.5 MW-DC ground mount system in Gloucester County, NJ. The solar farm will consist of over 57,000 crystalline modules installed across 98 acres. The system will interconnect to the Atlantic City Electric system at 12kV.