Photo of the Week - Avoiding Top Entry of Conduits

Written by Rick Ivins | Jan 8, 2014 9:59:04 PM

In this installation, an AC panel board was located at ground level which combined the AC circuits from string inverters on the roof. We wanted to avoid entering the top of the enclosure with conduits, so a trough was used so that the feeders could enter through the bottom of the enclosure.